Why Pavement Fails (And How to Prevent It)

At We Love Paving, we’ve repaired thousands of cracked, sunken, and prematurely failing parking lots. But in most cases, the problem didn’t start at the surface—it started beneath it.

Paving failures almost always trace back to one key issue: inadequate subgrade and base preparation.

If you want a surface that lasts 20+ years—not just 2—this blog will walk you through why proper ground prep matters and how WLP does it right from the start.


🧱 1. What Is the Subgrade—and Why It Matters

The subgrade is the native soil or engineered fill below your pavement. Its strength, moisture content, and uniformity determine how well it can support the loads from asphalt or concrete above.

If the subgrade is:

  • Too soft or loose → settling and cracking

  • Poorly drained → potholes, heaving, erosion

  • Inconsistent → surface shifting and uneven wear

That’s why WLP always begins with a full soil evaluation—testing compaction, moisture, and load-bearing capacity before moving forward.


⚙️ 2. The Role of the Base Layer

The base layer (often made of crushed aggregate or road base) acts as the structural foundation of the pavement. It spreads loads from traffic evenly and allows water to drain away from the surface.

Best practices include:

  • Installing 4” to 8” of compacted base, depending on traffic

  • Using clean, angular aggregate

  • Compacting in lifts to 95%+ density using vibratory rollers

  • Confirming cross slope or crown for proper drainage

At WLP, we follow industry-standard specs and city code requirements for base depth and compaction—and go beyond them when needed.


💧 3. Drainage Is Just as Important as Strength

No matter how well your pavement is built, it will fail if water sits on or under it.

That’s why we incorporate:

  • Laser-guided grading to ensure proper surface slope (1–2%)

  • Subsurface drainage layers where water retention is an issue

  • French drains, trench systems, or swales depending on terrain

  • Edge protection to prevent erosion or rutting


🛠️ 4. Common Signs of Poor Base Prep

If you’re seeing any of these in your lot or driveway, the base or subgrade likely wasn’t properly prepared:

  • Early cracking within 1–3 years

  • Soft spots or “sinking” near edges

  • Pooling water after rain

  • Alligator cracking patterns

  • Heaving or frost damage in winter zones

WLP offers site inspections to assess your current surface and identify what’s happening beneath.


🏗️ 5. How WLP Ensures Long-Term Performance

Our process includes:

  • Site grading with GPS or laser-controlled equipment

  • Soil testing and treatment if required

  • Base layer installation to engineered specs

  • Geotextile separation fabric in unstable areas

  • Full compaction logs and slope verification

Because surface beauty means nothing without structural integrity.


📞 Want a Surface That Actually Lasts?

Whether you’re paving a new commercial lot, rebuilding a failed driveway, or adding ADA ramps on sloped terrain—We Love Paving builds it right from the ground up.

👉 Contact us today for a site evaluation and engineered paving quote.

📍 Serving Fremont, Bayshore, Diablo Valley, and mountain communities across California.


Share

WHO IS FRED?

Fred, Regional Operations Manager, comes from a family of immigrant roots and a story built on sacrifice, discipline, and hard work. Growing up, Fred watched his parents work long hours and weekends to create a better future teaching him the values of perseverance, determination, and doing things the right way every single time.
We Love Paving began with Fred’s father, who started doing what he knew best: paving. Over the years, he built experience alongside respected professionals in the industry, refining his methods and developing a reputation for quality work that speaks for itself. As his clientele grew, so did the vision one built not only on skill, but on integrity and pride in every job.

Posts that might interest you

Why Commercial Asphalt Needs More Than Just Sealcoating

Why Commercial Asphalt Needs More Than Just Sealcoating

October 27, 2025

Why Professional Parking Lot Striping in Northern California Is the Secret to Safety and Curb Appeal

Why Professional Parking Lot Striping in Northern California Is the Secret to Safety and Curb Appeal

October 27, 2025

Parking Lot Size Standards: How to Design Safe and Efficient Lots That Meet Code

Parking Lot Size Standards: How to Design Safe and Efficient Lots That Meet Code

October 22, 2025

Why Smart Property Managers Treat Pavement as a Long-Term Asset | We Love Paving

Why Smart Property Managers Treat Pavement as a Long-Term Asset | We Love Paving

October 22, 2025

The Hidden Costs of Hiring the Cheapest Paving Contractor in Northern California | We Love Paving

The Hidden Costs of Hiring the Cheapest Paving Contractor in Northern California | We Love Paving

October 22, 2025

How Climate & Soil Conditions in Northern California Affect Your Parking Lot

How Climate & Soil Conditions in Northern California Affect Your Parking Lot

October 22, 2025

From Parking Lot to Profit: How a Well-Maintained Property Attracts Better Tenants

From Parking Lot to Profit: How a Well-Maintained Property Attracts Better Tenants

October 20, 2025

California Tightens Pavement Maintenance Regulations for Commercial Properties

California Tightens Pavement Maintenance Regulations for Commercial Properties

October 20, 2025

ADA Compliance: What Property Managers Usually Miss (Until It’s Too Late)

ADA Compliance: What Property Managers Usually Miss (Until It’s Too Late)

October 20, 2025

For property managers in California, ADA compliance isn’t just a regulation — it’s a responsibility. The Americans with Disabilities Act (ADA) requires that every property, parking lot, and walkway is accessible to people with disabilities. Unfortunately, many properties fail to meet these standards, not because owners don’t care, but because small details are often overlooked.

Understanding ADA Compliance for Parking Lots (2025 Update)

Understanding ADA Compliance for Parking Lots (2025 Update)

October 17, 2025

Previous Next