The $100,000 Mistake: Why Most GC Projects Fail Before Asphalt Even Starts (And How We Fix It)

Most GCs think asphalt problems start the day paving begins.

They don’t.

They start weeks or months earlier, quietly stacking up unnoticed issues from other trades—issues that explode right when the schedule is tightest, budgets are stressed, and owners want the job turned over.

And here’s the real cost:

One overlooked mistake before paving can cost a GC $50K–$100K in rework, delays, and emergency mobilizations.

This is the blog that explains why it happens… and how elite GCs prevent it.


1. The $100K mistake is NOT bad paving. It’s bad preparation.

Most “paving failures” aren’t caused by asphalt crews.

They’re caused by:

  • incorrect grade left by concrete

  • trench backfills not compacted by utilities

  • uneven base from demo crews

  • ADA slopes that don’t match plans

  • unaligned forms

  • subs working without coordination

  • unfinished drainage corrections

By the time the asphalt sub shows up, the job is already compromised.

Think of us as the last trade standing on top of everyone’s mistakes.

That’s the real $100K mistake.


2. How a project spirals BEFORE paving even begins

Here’s the silent chain reaction GCs rarely see until it’s too late:

Wrong grade left by concrete →

Asphalt thickness off → trip hazards → ADA fails → entire section must be torn out.

Cost: $25K–$40K.

Utility trenches poorly compacted →

Asphalt sinks → water ponds → owner complains → rework.

Cost: $15K–$30K.

Lines, forms, or layout off by 1–2 inches →

Cross-slopes become noncompliant.

Cost: $10K–$50K under inspection.

Drainage not corrected before paving →

Water flow wrong → puddles → premature failure.

Cost: $20K–$60K in accelerated deterioration.

This is how a “simple paving day” becomes a budget massacre.


3. Why GCs underestimate this problem

GCs assume subs will “adjust on site.”

Most asphalt crews can’t.
And the cheap ones won’t.

Surface prep, fine grading, and ADA corrections require:

  • laser-level accuracy

  • trained crews

  • heavy equipment

  • calibration knowledge

  • slope math

  • accountability

You can’t “wing” a compliant slope.
You can’t “fix” bad compaction with asphalt.
You can’t “adjust” a failed grade with a rake.

But subs with low bids pretend you can.


4. The WLP Difference: We audit the job BEFORE the job

This is where WLP flips the script completely.

Most asphalt subs show up on paving day.

We don’t.

WLP Step #1 — Pre-Paving Inspection (On Our Dime)

We walk the entire site days before mobilizing.

We check:

  • grades

  • cross-slopes

  • ADA ramps

  • drain flow

  • utility trench compaction

  • concrete transitions

  • high/low points

  • base uniformity

  • impact of other trades

This is where we catch the disasters before they cost $100K.

WLP Step #2 — Risk Report with Photos

We don’t just point out problems.
We send a clean, structured report your PM can hand to ownership or architects.

WLP Step #3 — Corrections Before Mobilization

We fix what other trades left behind:

  • regrading

  • milling high spots

  • filling low areas

  • compacting trenches

  • ADA slope corrections

  • drainage adjustments

This saves GCs from:

  • punch list nightmares

  • ADA lawsuits

  • failed inspections

  • angry owners

  • emergency rework

  • scheduling chaos

This is why elite GCs love us.


5. The math doesn’t lie — this is why we save GCs money

Before WLP process:
GC saves $5K hiring cheap sub →
Project fails →
Rework $40K–$100K →
Owner angry →
Delay penalties →
Profit gone.

After WLP process:
GC invests in the right sub →
Zero rework →
Zero ADA issues →
Zero emergency mobilization →
Owner happy →
Project delivered smoothly.

It’s not magic.
It’s discipline + process + accountability.


6. The harsh truth: cheap asphalt subs are the most expensive mistakes a GC can make

If your sub:

  • doesn’t walk the site before

  • doesn’t talk slopes

  • doesn’t check grades

  • doesn’t understand ADA

  • doesn’t ask about drainage

  • doesn’t document anything

…they’re not a partner. They’re a liability.

In 2026, with tighter inspection standards in California, a bad asphalt sub can destroy the entire project’s profitability.


7. How to avoid the $100K mistake (GC checklist)

Before awarding an asphalt scope, ask the sub:

✔️ Do you inspect the job before mobilizing?
✔️ Do you correct grades left by other trades?
✔️ Do you verify ADA?
✔️ Will you send a pre-paving report?
✔️ Can you handle drainage corrections?
✔️ Do you do multi-phase paving?
✔️ Do you have dedicated QC for paving day?

If any answer is “no,” the GC should walk away.


8. Final Word: Your asphalt sub can make or break your project

The $100K mistake isn’t optional.
It happens automatically when no one checks the site before paving.

The GCs who protect their budgets in 2026 are the ones who:

  • demand pre-paving inspections

  • only work with ADA-literate subs

  • choose predictable partners

  • eliminate rework before it happens

WLP was built for exactly this.


CTA (Premium & Direct for GCs)

If you’re a GC who wants zero rework, zero ADA surprises, and perfect paving days—
WLP can inspect your site before you mobilize a single truck.

👉 Request your Pre-Paving Risk Assessment (2026)
(We’ll tell you what every other sub missed.)


Share

WHO IS FRED?

Fred, Regional Operations Manager, comes from a family of immigrant roots and a story built on sacrifice, discipline, and hard work. Growing up, Fred watched his parents work long hours and weekends to create a better future teaching him the values of perseverance, determination, and doing things the right way every single time.
We Love Paving began with Fred’s father, who started doing what he knew best: paving. Over the years, he built experience alongside respected professionals in the industry, refining his methods and developing a reputation for quality work that speaks for itself. As his clientele grew, so did the vision one built not only on skill, but on integrity and pride in every job.

Posts that might interest you

Paving Company Vendors Unearthed: The Hunt Begins for Property Managers

Paving Company Vendors Unearthed: The Hunt Begins for Property Managers

June 14, 2023

Unveiling the Path to Finding the Perfect Paving Partner Rev up your search engines and prepare for a thrilling expedition, property managers! The quest for the ideal paving company vendor requires a keen eye, a dose of resourcefulness, and a touch determination. In this article, we unveil the secret roadmaps to discovering the paving partners of

Unveiling the Asphalt Avengers: Essential Insights for Property Managers Seeking Paving Company Vendors

Unveiling the Asphalt Avengers: Essential Insights for Property Managers Seeking Paving Company Vendors

June 14, 2023

Navigating the Road to Excellence – What Property Managers Should Consider Greetings, property managers and guardians of asphalt-clad territories! Today, we embark on a quest to uncover the crucial factors that should guide your search for the ultimate paving company vendor. Much like the meticulous selection of a supercar, finding the right partner to tame and conquer your

the 5 most common struggles and frustrations of property managers when hiring vendors

the 5 most common struggles and frustrations of property managers when hiring vendors

June 14, 2023

Property managers play a crucial role in the smooth operation and maintenance of various properties. One of the significant responsibilities they face is hiring and managing vendors who provide services such as landscaping, maintenance, repairs, and renovations. However, this task is often accompanied by several struggles and frustrations. In this article, we will explore some

How Long Does Asphalt Take to Dry and Fully Cure?

How Long Does Asphalt Take to Dry and Fully Cure?

June 6, 2023

Quick Answer: How Long to Wait? For a safe estimate, you should wait between 48 to 72 hours before walking on freshly paved asphalt. While the surface might feel solid within minutes, the internal structure requires this window to stabilize thermally. This timeframe can extend from 2 to 7 days depending on critical factors like

When does paving season end?

When does paving season end?

June 6, 2023

Paving season isn’t an abstract concept; it’s a concrete consideration for anyone embarking on a paving project, whether it’s for a residential driveway or a commercial parking lot. Knowing when to schedule your paving work can make all the difference between a smooth, durable surface and a potential headache down the road. Let’s explore the

How to Improve your Parking Lot Ratio!

How to Improve your Parking Lot Ratio!

May 4, 2023

The parking ratio of a commercial real estate property is the number of parking spaces available per square foot of leasable space. Having an adequate parking ratio is essential for attracting and retaining tenants, as it can impact their ability to conduct business and serve customers. If you own or manage a commercial property and

What is Commercial Property Depreciation?

What is Commercial Property Depreciation?

May 4, 2023

Commercial real estate investment holds immense potential for generating substantial returns over time. Beyond rental income and property appreciation, savvy investors employ various strategies to optimize their returns. One such strategy that often goes underappreciated is leveraging commercial real estate depreciation for tax benefits. In this comprehensive guide, we’ll explore how strategic depreciation can bolster

Can a Commercial Property be turned to residential?

Can a Commercial Property be turned to residential?

May 4, 2023

As cities evolve and populations grow, the demand for housing continues to rise. In response to this ever-present need, property owners and developers are exploring innovative ways to maximize the use of existing structures. One increasingly popular approach is the conversion of commercial properties into residential spaces. In this article, we’ll delve into the intricacies

A Paving Company near you!

A Paving Company near you!

May 4, 2023

When it comes to paving companies, there are a lot of options out there. But if you’re looking for a company that truly stands out from the crowd, look no further than We Love Paving. Here are just a few reasons why we believe our company is superior to our competition. Expertise and Experience At

when is the best season to pave?

when is the best season to pave?

May 4, 2023

Paving season is a pivotal period in the construction industry, demanding careful planning and consideration to ensure successful project execution. Understanding the ideal timing for paving is essential for contractors and project managers alike, as it significantly impacts project outcomes. Let’s delve into the factors that influence paving season and determine the best time to

Previous Next